Soil riverbank cleanup

Sediment Source Control Action

Lower Willamette River – Portland, OR CRETE prepared the design and bid documents for the removal, capping, and stabilization of 1,700 lineal feet of riverbank fronting an active steel mill on the eastern bank of the Lower Willamette River within the Portland Harbor Superfund Site. Work was conducted through a Voluntary Remedial Investigation Source Control […]