Environmental Assessment and Demolition

Berth 4 Grain Elevator/Silo Complex – Longview, WA CRETE performed an environmental site assessment, prepared design and construction documents, and provided bid support and construction oversight for demolition of the Berth 4 Grain Elevator/Silo Complex project on the Columbia River for the Port of Longview. The original complex was built in 1927 and was operated […]

In-Situ Soil Stablization

RG Haley, Sediment and Upland Cleanup- Bellingham, WA CRETE prepared the design and bid documents for in-situ soil mixing of contaminated shoreline soil for this brownfield redevelopment at a former lumber mill and wood-treating site on Bellingham Bay. Wood treating operations resulted in soil, groundwater, and sediment contamination with total petroleum hydrocarbons (TPH; medium aromatic […]

Former Aluminum Smelter

Brownfield Development – Kent, WA CRETE is led the site investigation, waste profiling, permitting, design and construction oversight for the cleanup of a secondary aluminum smelter site in Kent, WA. Maralco Aluminum operated from 1980 to 1986 when the property was abandoned and over 30,000 cubic yards (cy) of waste from smelting activities was abandoned […]

Municipal Utility Upgrades

Phase I ESAs and Design Support

Municipal Utility Upgrades – Burien, WA CRETE principals subcontracted to a civil engineering firm to perform a Phase I environmental site assessment associated with the design of a significant utility and right-of-way enhancement project. The project was for a 2-mile stretch of a commercial business district with stormwater outfall to a salmon-bearing stream. The purpose […]